{"id":254074,"date":"2025-11-19T08:45:22","date_gmt":"2025-11-19T08:45:22","guid":{"rendered":"https:\/\/t-werk.eu\/quotation-preparation-the-important-role-of-fully-completed-checklists\/"},"modified":"2025-11-25T10:41:03","modified_gmt":"2025-11-25T10:41:03","slug":"quotation-preparation-the-important-role-of-fully-completed-checklists","status":"publish","type":"post","link":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/","title":{"rendered":"Quotation preparation: The important role of fully completed checklists"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for safe and efficient installation are created.   <\/p>\n\n<p class=\"wp-block-paragraph\">The most important information briefly explained:<\/p>\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Specification<\/td><td>What we need them for<\/td><td>Notes on recording<\/td><\/tr><tr><td>Address<\/td><td>Determination of the building category and regional wind and snow loads<\/td><td>Please provide the full address of the property (street, zip code, town). In the case of new buildings, please include the parcel\/address of the building owner and site plan. <\/td><\/tr><tr><td>Building height<\/td><td>Basis for statics and ballasting<\/td><td><\/td><\/tr><tr><td>Attic height and width<\/td><td>Relevant for statics, ballasting and module design<\/td><td><\/td><\/tr><tr><td>Roof pitch<\/td><td>Product selection (which system is permissible) and ballasting<\/td><td>In degrees or percent; please indicate whether sloping on one or two sides, as well as direction of slope.<\/td><\/tr><tr><td>Roof covering (e.g. bitumen, trapezoidal)<\/td><td>Selecting the right substructure and fastening<\/td><td>For trapezoidal sheet metal: Bead spacing, sheet thickness and trapezoidal height<br\/>Please let us know your desired UK (e.g. ZELOS or CHRONOS).<\/td><\/tr><tr><td>Module type (data sheet)<\/td><td>Weight and size specifications of the modules are important for an accurate design\/statics<\/td><td>In the best case, send a data sheet for the desired module<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p class=\"wp-block-paragraph\">If you are not yet listed as a partner with us:<\/p>\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Carpet pad<\/td><td>Format\/specification<\/td><\/tr><tr><td>VAT ID no.<\/td><td>VAT ID no. (e.g. DE&#8230;) <\/td><\/tr><tr><td>Contact details<\/td><td>Company, contact person, telephone, e-mail, billing &amp; delivery address<\/td><\/tr><tr><td>Extract from the commercial register<\/td><td>PDF or link (current version)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p class=\"wp-block-paragraph\">If this information is complete, we can process your inquiry quickly and you will receive a reliable quote promptly. At the same time, your installers benefit: precise project data is the basis for a clear ballasting and installation plan that enables safe and efficient installation on the roof. <\/p>\n\n<p class=\"wp-block-paragraph\">Optionally, we would be pleased if you could provide us with further data, if available. This will allow us to plan in even greater detail and prepare a more accurate quotation: <\/p>\n\n<ul class=\"wp-block-list\">\n<li>Current photos<\/li>\n\n\n\n<li>Roof structure<\/li>\n\n\n\n<li>Occupancy or string plan<\/li>\n\n\n\n<li>Load-bearing capacity of the roof<\/li>\n\n\n\n<li>Lightning protection\/fire protection specifications<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">You can find the appropriate checklists for your PV project in our <a href=\"https:\/\/t-werk.eu\/en\/downloadarea\/\" title=\"\">download area<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":254077,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[325,809],"tags":[1038,1039,384,1040],"class_list":["post-254074","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general","category-the-company","tag-checklist","tag-offer-substructure","tag-photovoltaics","tag-pv-mounting-system"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.2.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Markus M\u00e4rz\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.2.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"T.Werk GmbH - Solar-Montagesysteme\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH\" \/>\n\t\t<meta property=\"og:description\" content=\"The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-11-19T08:45:22+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-11-25T10:41:03+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#blogposting\",\"name\":\"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH\",\"headline\":\"Quotation preparation: The important role of fully completed checklists\",\"author\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/author\\\/markus-maerz\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/t-werk.eu\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Kopie-von-Linkedin_Post_SILENOS-Gabionen.png\",\"width\":300,\"height\":186},\"datePublished\":\"2025-11-19T08:45:22+00:00\",\"dateModified\":\"2025-11-25T10:41:03+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#webpage\"},\"articleSection\":\"General, The company, checklist, offer substructure, photovoltaics, PV mounting system, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/category\\\/general\\\/#listItem\",\"name\":\"General\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/category\\\/general\\\/#listItem\",\"position\":2,\"name\":\"General\",\"item\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/category\\\/general\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#listItem\",\"name\":\"Quotation preparation: The important role of fully completed checklists\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#listItem\",\"position\":3,\"name\":\"Quotation preparation: The important role of fully completed checklists\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/category\\\/general\\\/#listItem\",\"name\":\"General\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/#organization\",\"name\":\"T.Werk GmbH | PV Montagesysteme\",\"description\":\"Solar-Montagesysteme\",\"url\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/\",\"email\":\"info@t-werk.eu\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/author\\\/markus-maerz\\\/#author\",\"url\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/author\\\/markus-maerz\\\/\",\"name\":\"Markus M\\u00e4rz\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#authorImage\",\"url\":\"https:\\\/\\\/t-werk.eu\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/250211_Maerz-Markus-scaled-96x96.jpg\",\"width\":96,\"height\":96,\"caption\":\"Markus M\\u00e4rz\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#webpage\",\"url\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/\",\"name\":\"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH\",\"description\":\"The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/author\\\/markus-maerz\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/author\\\/markus-maerz\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/t-werk.eu\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Kopie-von-Linkedin_Post_SILENOS-Gabionen.png\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#mainImage\",\"width\":300,\"height\":186},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/quotation-preparation-the-important-role-of-fully-completed-checklists\\\/#mainImage\"},\"datePublished\":\"2025-11-19T08:45:22+00:00\",\"dateModified\":\"2025-11-25T10:41:03+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/\",\"name\":\"T.Werk GmbH | T.Werk GmbH\",\"alternateName\":\"T.Werk GmbH\",\"description\":\"Solar-Montagesysteme\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/t-werk.eu\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH","description":"The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for","canonical_url":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#blogposting","name":"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH","headline":"Quotation preparation: The important role of fully completed checklists","author":{"@id":"https:\/\/t-werk.eu\/en\/author\/markus-maerz\/#author"},"publisher":{"@id":"https:\/\/t-werk.eu\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/t-werk.eu\/wp-content\/uploads\/2025\/11\/Kopie-von-Linkedin_Post_SILENOS-Gabionen.png","width":300,"height":186},"datePublished":"2025-11-19T08:45:22+00:00","dateModified":"2025-11-25T10:41:03+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#webpage"},"isPartOf":{"@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#webpage"},"articleSection":"General, The company, checklist, offer substructure, photovoltaics, PV mounting system, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/t-werk.eu\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/t-werk.eu\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/t-werk.eu\/en\/category\/general\/#listItem","name":"General"}},{"@type":"ListItem","@id":"https:\/\/t-werk.eu\/en\/category\/general\/#listItem","position":2,"name":"General","item":"https:\/\/t-werk.eu\/en\/category\/general\/","nextItem":{"@type":"ListItem","@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#listItem","name":"Quotation preparation: The important role of fully completed checklists"},"previousItem":{"@type":"ListItem","@id":"https:\/\/t-werk.eu\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#listItem","position":3,"name":"Quotation preparation: The important role of fully completed checklists","previousItem":{"@type":"ListItem","@id":"https:\/\/t-werk.eu\/en\/category\/general\/#listItem","name":"General"}}]},{"@type":"Organization","@id":"https:\/\/t-werk.eu\/en\/#organization","name":"T.Werk GmbH | PV Montagesysteme","description":"Solar-Montagesysteme","url":"https:\/\/t-werk.eu\/en\/","email":"info@t-werk.eu"},{"@type":"Person","@id":"https:\/\/t-werk.eu\/en\/author\/markus-maerz\/#author","url":"https:\/\/t-werk.eu\/en\/author\/markus-maerz\/","name":"Markus M\u00e4rz","image":{"@type":"ImageObject","@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#authorImage","url":"https:\/\/t-werk.eu\/wp-content\/uploads\/2025\/02\/250211_Maerz-Markus-scaled-96x96.jpg","width":96,"height":96,"caption":"Markus M\u00e4rz"}},{"@type":"WebPage","@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#webpage","url":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/","name":"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH","description":"The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/t-werk.eu\/en\/#website"},"breadcrumb":{"@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#breadcrumblist"},"author":{"@id":"https:\/\/t-werk.eu\/en\/author\/markus-maerz\/#author"},"creator":{"@id":"https:\/\/t-werk.eu\/en\/author\/markus-maerz\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/t-werk.eu\/wp-content\/uploads\/2025\/11\/Kopie-von-Linkedin_Post_SILENOS-Gabionen.png","@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#mainImage","width":300,"height":186},"primaryImageOfPage":{"@id":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/#mainImage"},"datePublished":"2025-11-19T08:45:22+00:00","dateModified":"2025-11-25T10:41:03+00:00"},{"@type":"WebSite","@id":"https:\/\/t-werk.eu\/en\/#website","url":"https:\/\/t-werk.eu\/en\/","name":"T.Werk GmbH | T.Werk GmbH","alternateName":"T.Werk GmbH","description":"Solar-Montagesysteme","inLanguage":"en-US","publisher":{"@id":"https:\/\/t-werk.eu\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"T.Werk GmbH - Solar-Montagesysteme","og:type":"article","og:title":"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH","og:description":"The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for","og:url":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/","article:published_time":"2025-11-19T08:45:22+00:00","article:modified_time":"2025-11-25T10:41:03+00:00","twitter:card":"summary_large_image","twitter:title":"Quotation preparation: The important role of fully completed checklists - T.Werk GmbH","twitter:description":"The preparation of a quotation for a PV substructure requires precise project data. Our checklists bundle this information in a structured manner. Once they have been completed in full, we can reliably calculate the statics and ballasting and select the ideal substructure. Queries are minimized, you receive a comprehensible quotation promptly and the prerequisites for"},"aioseo_meta_data":{"post_id":"254074","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2025-11-25 10:33:39","updated":"2025-11-25 10:48:38","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/t-werk.eu\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/t-werk.eu\/en\/category\/general\/\" title=\"General\">General<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tQuotation preparation: The important role of fully completed checklists\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/t-werk.eu\/en\/"},{"label":"General","link":"https:\/\/t-werk.eu\/en\/category\/general\/"},{"label":"Quotation preparation: The important role of fully completed checklists","link":"https:\/\/t-werk.eu\/en\/quotation-preparation-the-important-role-of-fully-completed-checklists\/"}],"_links":{"self":[{"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/posts\/254074","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/comments?post=254074"}],"version-history":[{"count":1,"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/posts\/254074\/revisions"}],"predecessor-version":[{"id":254075,"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/posts\/254074\/revisions\/254075"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/media\/254077"}],"wp:attachment":[{"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/media?parent=254074"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/categories?post=254074"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/t-werk.eu\/en\/wp-json\/wp\/v2\/tags?post=254074"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}